How to build ?
The Construction Step we separate become 2 category :
1. Consultant and planning step
2. Construction and builder step
Our job Method are :
1. Meeting with the client
2. Consultant and planning step
a. The Client sign the Letter of Outherney ( Surat Perintah Kerja )
b. Site Analyze
Remeasurement the land site, the width, the length, and the diagonal,
the topography of land, the view, and the neighborhoods.
c. Design Planning
Our Architect will give you some of block plan alternative.
d. Discuss with owner
How our architect will translate your ideas to the drawing paper.
e. Asbuild Drawing Paper
After we have the fix sketch, let’s us do the drawing paper.
f. 3D Rendering Image
After we finish the drawing papers, we do the 3d rendering to visually
the building.
g. Real Cost Estimate for Construction
In the middle of drawing, our civil will count the real cost estimate
for construction based on the material attach in the drawing that have
been discussed.
h. Time Schedule for Construction
And our team will also make a time Schedule for Construction, how long
will the building finish.
3. Construction and builder step
a. Preliminary
Preliminary Are how to prepare the building permit, site cleaning, village
donation, insurance during construction, electrical supply, etc.
b. The Building
All the building side, from zero to end. The main building, the side building,
the parking, gazebo, etc.
c. Pool
Main pool, swimming pool, kid pool, pool sundeck, the lotus ponds, etc.
d. External / Garden
Garden and landscape, boundary wall or fence wall, etc.
e. Electrical and Plumbing System
The lighting and the plumbing pump system to sanitary.
f. Miscellaneous
Miscellaneous are a optional choice to make the building complete, there
are :
? Kitchen set
? Sanitary tools hardware
? Pool pump machine
? Furniture and equipment
? Internet tools
4. Maintenance phase
After the building finish, we give you guarantee around one month.
The guarantee including all our job done.
|